User Tools

Site Tools


portugal_ww2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
portugal_ww2 [2025/11/11 20:45] goaportugal_ww2 [2026/04/01 20:28] (current) – external edit 127.0.0.1
Line 43: Line 43:
 **Iberian Infrastructure Project** **Iberian Infrastructure Project**
  
- Very late into the server Falklands tirelessly laboured to create a road network across all of Iberia including a bridge over Gibraltar. Although it was functionally a complete waste of time because he was the only remaining active player, Falklands enjoyed adding what little bit of soul he could to his new lands.+ Very late into the server Falklands tirelessly laboured to create a road network across all of Iberia including a bridge over Gibraltar. Although it was a complete waste of time because he was the server'only remaining player, Falklands enjoyed adding what little bit of soul he could to his new lands.
  
 **Legacy** **Legacy**
portugal_ww2.1762893913.txt.gz · Last modified: 2026/04/01 20:17 (external edit)

Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki